Distant Location (Notes 1 and 2)
|
Operator Equipment Room
|
|
Note V - Out of Hours are specified as outside of 8am to 5pm Monday-Friday excluding Bank Holidays.
Note W - 1.5KW / 3KW DC Power, 750VA Inverter, Additional rectifier and Sub-meter provided as standard with additional costs as per price list
Note X - 4.5KW / 6KW DC Power, 750VA Inverter, Additional rectifier and Sub-meter provided as standard with additional costs as per price list
Note Y - Sub-meter provided as standard with additional costs as per price list
Note Z - DC Power, 1500VA Inverter, Additional rectifier and Sub-meter provided as standard with additional costs as per price list
|
|
|
Escorted Access
|
Note:
1) Charges may be payable on submission by the Operator of incomplete or inaccurate requests and equal to 25% of the appropriate charge.
2) All charges will be due and payable by the relevant Due Date in accordance with the Agreement.
3) Charges for Operator Equipment Room Works will vary depending on location, room size, equipment installed, amount of conversion required etc. Bespoke rooms built to the same standard as the Co-location Hostel specification will be charged on the same basis as Co-location Hostel pricing principles.
4) This charge will be payable quarterly in advance on 1st Jan, 1st April, 1st July or 1st October depending on when the relevant service or product starts or is deemed Ready for Service. BT will apportion rental on a daily basis for the initial period if that initial period is less than a Quarter.
5) Bespoke charges will be adjusted if appropriate during the Works.
6) Servicing of equipment in addition to standard equipment available in a standard Co-location Hostel bay.
7) This usage rate is applied to both Standard Electricity and Standby Electricity.
8) This is charged per day or part thereof on a per MDF Site basis. This charge also applies for abortive deliveries as a result of an Operator request.
9) The billable area is rounded up to the nearest square decimetre (1/100 of a square metre).
10) Operators will be credited with £1375 against the estimated Operator Equipment Room Works and associated invoices. Only applicable if operator proceeds to build.
11) The billable area is calculated by the area of the number of Rack Space Units ordered and multiplied by 3.85. The billable area is indicated in the offer document.
12) This will automatically be provided as part of the Co-mingling order dependant on the number of rack space units ordered.
13) These costs are for providing the required power and cooling for the maximum power rating the Operator orders for the Co-mingling facilities.
14) These charges are raised quarterly in arrears.
15) These charges are raised monthly in arrears.
16) The date these prices apply is related to the completed/ handover date and is not dependent on when the order is placed.
17) Planned access = 3 working days or greater notice. Unplanned access = less than 5 working days notice. Average response time = 4 hours. Business hours are Monday – Friday 08:00 to 17:00
18) These prices are calculated using a minimum of 4 hours including BT travelling time. After 4 hours has expired, the appropriate hourly charge will be applied.
19) This charge will apply to all orders whether for ESS or non ESS supply.
20) This charge applies only if sub meter is requested on the initial order. Subsequent order for sub metering will raise a bespoke charge.
21) Applicable to co mingling. Charge covers provision / re programming of electronic access cards and provision of external gate keys.22) Charge applicable to co-mingling installations only.
23) This audit is renewable on a 12 monthly basis as per ISO registration timescales.
24) Where DC Power options are ordered, the maximum AC power capacity will be supplied.
25) This cancellation schedule applies to Co Mingling orders only.
26) This charge is applied when a forecast order for a co mingling product is not followed up with a firm order.
27) On completion of upgrade, all applicable rental charges will move to the upgraded product rates.
28) Ancillary bolt ons include :- Post intial build provision of UPS rectifiers, HDF security doors, UPS power lead restraints. Replacement of existing batteries with higher specification units, additional battery string, replacement of exisiting UPS with higher specification unit, replacement of existing UPS internal battery unit with higher specification battery to provide greater UPS autonomy, ASS600 upgrade, BBUSS fusing and lighting upgrade HDF9 to HDF18 upgrade, Post build testing, Retro fit of sub meter.
Electricity Supply
|
|
Note:
1) All charges will be due and payable by the relevant Due Date in accordance with the Agreement.
2) This charge will be payable quarterly in advance on 1st Jan, 1st April, 1st July or 1st October depending on when the relevant service or product starts or is deemed Ready for Service. BT will apportion rental on a daily basis for the initial period if that initial period is less than a Quarter.
3) This usage rate is applied to both Standard Electricity and Standby Electricity.
4) For Co-mingling orders where sub-metering is not requested the charge applied will be: Published rate x 365.25 x 24 x No of kW
5) This charge applies only if sub meter is requested on the initial order. Subsequent order for sub metering will raise a bespoke charge.
6) On completion of upgrade the existing product annual rental charge will amend to the revised product level annual rental charge.