For terms and conditions applicable to these charges payable to BT see the Conditions section of the Connectivity Services Contract.
Description
|
|
|
Generic Resilience Facility Fee charges are detailed in the Ethernet Products section of the price list, that can be found at:
Subsequent Outside Broadcast Event Charges (Note 7)
Time Related charges apply where a customer requires Openreach to set up, test and decommission an Outside Broadcast circuit for subsequent Outside Broadcast events. The prevailing charges that will apply to this service are Time Related Charges. These are detailed in the Service Products section of the price list, Section 4.2.1 that can be found at:
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
|
|
Time Related Charges (Note 7) | |||||||||
Time Related Charges are detailed in the Service Products section of the price list, can be found at: | |||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do | |||||||||
Excess Construction Charges (Note 8) | |||||||||
Excess Construction Charges are detailed in the Service Products section of the price list, can be found at: | |||||||||
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do |
|
Openreach service products section: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
|
Note:
Notes relevant only to Broadcast Access Olympic variant:
1. Standard Broadcast Access terms and conditions apply for Olympic Broadcast Access with the following additions.
2. Circuit orders must be placed before the end of December 2011. Orders to this date will be satisfied. After this date all potential subsequent orders will be subject to BT’s ability to provide service.
3. This product will only be available for installation at Olympic venues covered by zone 2.
4. Available for new supply on 1st July 2011; the product will then be withdrawn on 15th September 2012 (shortly after the Paralympic Games).
5. Orders for service within zone 2 with a radial distance greater than 35km will not qualify for service level guarantees the ability to supply these services are dependent on the optical budget of the OBSL broadcast network termination unit.
Note:
1) These prices will be applied in accordance with the ‘Conditions’ section of the Connectivity Services Contract.
2) All Orders taken for the provision of Broadcast Access are subject to feasibility checks to ensure that service can be technically provided. BT reserves the right to charge Excess Construction Charges where necessary, including situations where suitable fibre from the local serving exchange does not exist or is deficient.
3) A fixed charge is made per circuit. For Local and Remote Outside Broadcast Services, an appropriate Outside Broadcast van NTE will need to be purchased. An additional Main Link charge is made for each circuit, calculated on the radial distance between the local serving exchanges. Main Link charges do not apply for circuits within the same local serving exchange area.
4) Rental is payable in advance. Quarterly billing of this item is offered as standard. Monthly billing is also available upon request. A 28 day cut off period is applicable prior to the end of the standard quarterly billing cycle.
5) All days will be calculated as Working Days, i.e. ignoring weekends and public or bank holidays in the Territory. The cancellation date must be given in writing by the Communications Provider. If BT fails to meet the Contractual Delivery Date and the Communications Provider cancels the order, a charge will not be raised. The full cost of any additional work, e.g. duct, which has been specifically incurred for the order by the time of the cancellation, will be recovered in addition to the cancellation charge. Should a Communications Provider request amendments to the Contractual Delivery Date and subsequently cancels the order, the cancellation charge will be calculated on the days between the dates that the Communications Provider notified BT of the first amendment and the original Contractual Delivery Date.
6) The one off charges listed for the additional CP Equipment will be billed as an additional element of the Broadcast Van Network Terminating Equipment connection charges. For further information please refer to the Broadcast Access product handbook that can be found at:http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
7) For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list, can be found at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
8) Excess Construction Charges will be raised in addition to normal connection charges where additional infrastructure is provided to give new or extended service at a remote street furniture site or other requested location where BT would otherwise not choose to extend its network on the basis of normal commercial criteria. Excess Construction Charges apply to situations of extended reach, including provision to a new location, but do not apply to situations where existing capacity needs to be increased. There is no ‘within tariff’ allowance - the full value of any applicable charge is payable. Excess Construction Charges are detailed in the Service Products section of the price list, can be found at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
9) Please note that shifts are not possible for the Local and Remote Access Service and Local and Remote Outside Broadcast Service at the exchange end of the service.
10) Service Product charges will be applied in addition to standard connection charges, if applicable
11) Resilient option 2 is available as part of the Broadcast Access product offering. Pricing can be found at: http://www.openreach.co.uk/orpg/pricing/ethernet.do
12) All orders for the provision of Generic Resilience are subject to the Terms and Conditions for Connectivity Services.
13) Please note that shifts are not possible for Local Access, Remote Access, Local Outside Broadcast and Remote Outside Broadcast services at the exchange end of the circuits.