For terms and conditions applicable to these charges payable to BT, please see the Conditions section of the Connectivity Services Contract.
Feature | Note | Operative date | Until | Connection £ Exc VAT | Annual Rental £ Exc VAT | |
---|---|---|---|---|---|---|
2.5G/STM1 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 12/06/2012 | 30/04/2013 | TOA | TOA |
2.5G/STM1 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 01/05/2013 | 10/05/2016 | 14,472 | 10,832 |
2.5G/STM1 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 11/05/2016 | Withdrawn | 10,832 | |
2.5G/STM4 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 12/06/2012 | 30/04/2013 | TOA | TOA |
2.5G/STM4 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 01/05/2013 | 10/05/2016 | 14,472 | 10,832 |
2.5G/STM4 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 11/05/2016 | Withdrawn | 10,832 | |
2.5G/STM16 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 12/06/2012 | 30/04/2013 | TOA | TOA |
2.5G/STM16 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 01/05/2013 | 10/05/2016 | 14,472 | 10,832 |
2.5G/STM16 - UK excluding FlexZone | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 11/05/2016 | Withdrawn | 10,832 | |
TDM Access Generic Resilient Facility Fee | Per resilient circuit - 5 year minimum period | Note 1, 2, 3, 5, 8, 9 and 10 | 12/06/2012 | 30/04/2013 | TOA | TOA |
TDM Access Generic Resilient Facility Fee - UK excluding FlexZone | Per resilient circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 01/05/2013 | 10/05/2016 | N/A | 800 |
TDM Access Generic Resilient Facility Fee - UK excluding FlexZone | Per resilient circuit - 5 year minimum period | Note 1, 2, 3, 5, 9 and 10 | 11/05/2016 | Withdrawn | 800 |
Terms On Application (TOA)
Feature | Note | Operative date | Until | Annual Rental £ Exc VAT | |
---|---|---|---|---|---|
Main link | Per metre or part thereof | Note 2 and 3 | 12/06/2012 | 30/04/2013 | TOA |
Main link - UK excluding FlexZone | Per metre or part thereof | Note 2 and 3 | 01/05/2013 | 0.40 | |
Resilient Main link (per resilient circuit) | Per metre or part thereof | Note 2 and 3 | 12/06/2012 | 30/04/2013 | TOA |
Resilient Main link (per resilient circuit) - UK excluding FlexZone | Per metre or part thereof | Note 2 and 3 | 01/05/2013 | 0.456 |
Terms On Application (TOA)
Feature | Note | Operative date | Until | Connection £ Exc VAT | Annual Rental £ Exc VAT | |
---|---|---|---|---|---|---|
2.5G/STM1 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 01/05/2013 | 10/05/2016 | TOA | TOA |
2.5G/STM1 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 11/05/2016 | Withdrawn | TOA | |
2.5G/STM4 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 01/05/2013 | 10/05/2016 | TOA | TOA |
2.5G/STM4 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 11/05/2016 | Withdrawn | TOA | |
2.5G/STM16 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 01/05/2013 | 10/05/2016 | TOA | TOA |
2.5G/STM16 | Per circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 11/05/2016 | Withdrawn | TOA | |
TDM Access Generic Resilient Facility Fee | Per resilient circuit - 5 year minimum period | Note 1, 2, 3, 5, 9, 10 and 11 | 01/05/2013 | TOA | TOA | |
Main link | Per metre or part thereof | Note 2, 3 and 11 | 01/05/2013 | N/A | TOA | |
Resilient Main link (per resilient circuit) | Per metre or part thereof | Note 2, 3 and 11 | 01/05/2013 | N/A | TOA |
Notes:
Terms On Application (TOA)
Cancellation charges are compensatory and not subject to VAT
Feature | Working Days before CDD or on completion of following activities | % of Connection Charge | Note | Operative date |
---|---|---|---|---|
CDD minus 2 days | 95% | Note 4 | 12/06/2012 | |
CDD minus 10 days to CDD minus 3 days | 75% | Note 4 | 12/06/2012 | |
KCI3 to CDD minus 11 days* | 5% | Note 4 | 12/06/2012 |
The % charge starts 5 working days after the KCI3 update is issued on the order
Feature | Note | Operative date | Until | Connection Charge £ Exc VAT |
---|---|---|---|---|
Shift - Internal. Internal Shift of a local end within the existing building. | Notes 6 and 7 | 12/06/2012 | Openreach Time Related Charges (TRC) will apply | |
Shift - External Resite. Resiting of local end in another building served by the same local serving exchange | Notes 6 and 7 | 12/06/2012 | 10/05/2016 | Connection charge equal to 50% of the standard connection charge |
Shift - External Resite. Resiting of local end in another building served by the same local serving exchange | Notes 6 and 7 | 11/05/2016 | Withdrawn | |
Shift - External Rearrange. Rearranging a local end in another building served by a different local serving exchange | Notes 6 and 7 | 12/06/2012 | 10/05/2016 | Connection charge equal to 50% of the standard connection charge & Re-calculation of new revised Main Link rental charges. Also check to ensure main link distance is not beyond the maximum. |
Shift - External Rearrange. Rearranging a local end in another building served by a different local serving exchange | Notes 6 and 7 | 11/05/2016 | Withdrawn |
Feature | Years after Contractual Delivery Date | % of Standard Annual Rental Charge | Operative date |
---|---|---|---|
<1 | 100% | 12/06/2012 | |
<2 | 90% | 12/06/2012 | |
<3 | 80% | 12/06/2012 | |
<4 | 70% | 12/06/2012 | |
<5 | 60% | 12/06/2012 |
Feature | Note | Operative date | Until | Connection Charges £ Exc VAT |
---|---|---|---|---|
From 2.5G/STM1 to 2.5G/STM4 | Note 6 | 12/06/2012 | 10/05/2016 | Openreach Time Related Charges (TRC) will apply. |
From 2.5G/STM1 to 2.5G/STM4 | Note 6 | 11/05/2016 | Withdrawn | |
From 2.5G/STM1 to 2.5G/STM16 | Note 6 | 12/06/2012 | 10/05/2016 | Openreach Time Related Charges (TRC) will apply. |
From 2.5G/STM1 to 2.5G/STM16 | Note 6 | 11/05/2016 | Withdrawn | |
From 2.5G/STM4 to 2.5G/STM16 | Note 6 | 12/06/2012 | 10/05/2016 | Openreach Time Related Charges (TRC) will apply. |
From 2.5G/STM4 to 2.5G/STM16 | Note 6 | 11/05/2016 | Withdrawn |
Other Charges
Time Related Charges
For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list, that can be found at:
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
Excess Construction Charges
Charges for network infrastructure over and above standard requirements are charged as excess construction and can be found in `Excess Construction Charges' in the Service Products section of this Price List at :
http://www.openreach.co.uk/orpg/pricing/serviceproducts.doNotes:
1) These prices will be applied in accordance with the 'Conditions' section of the Connectivity Services Contract.
2) A Site is assumed to be served by suitable fibre from the local exchange. All Orders taken for the provision of TDM Access Bearer are subject to feasibility checks to ensure that service can be technically provided. BT reserves the right to charge Excess Construction Charges where necessary including in situations where suitable fibre from the local serving exchange does not exist or is deficient.
3) Rental is payable in advance. Quarterly billing of this item is offered as standard. Monthly billing is also available upon request. A 28 day cut off period is applicable prior to the end of the standard quarterly billing cycle.
4) All days will be calculated as Working Days, i.e. ignoring weekends and public holidays. The cancellation date must be given in writing by the Communications Provider. If BT fails to meet the Contractual Delivery Date and the Communications Provider cancels the order, a charge will not be raised. The full cost of any additional work, e.g. duct, which has been specifically incurred for the order by the time of the cancellation, will be recovered in addition to the cancellation charge. Should a Communications Provider request amendments to the Contractual Delivery Date and subsequently cancel the order, the cancellation charge will be calculated on the days between the dates that the Communications Provider notified BT of the first amendment and the original Contractual Delivery Date.
5) All services include the care level set out in the Service Level Agreement within tariff.
6) Additional charges may be raised where non standard work is required. For work done by Openreach engineers not included in standard prices see `Time Related Charges' in the Service Products section of the price list for details:
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
7) Excess Construction Charges will be raised in addition to normal Connection charges where additional infrastructure is provided to give new or extended service at a Site / Communications Provider's Site or other requested location where BT would otherwise not choose to extend its network on the basis of normal commercial criteria. Excess charges apply to situations including provision to a new location within the Site / Communications Provider's Site but does not apply to situations where existing capacity needs to be increased. There is no 'within tariff' allowance - the full value of any applicable charge is payable. Excess Construction Charges are detailed in the Service Products section of the price list that can be found at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
8) If a Communications Provider requires a non resilient circuit to be regraded to Resilience Option 2 that requires routing re-work, then a cease and re-provide has to be requested.
9) The price applicable to Connection will be that price quoted as part of the Order process which will be that applicable at the date of Order placement. When prices change the new prices will only apply to new Orders received subsequent to the date that a price change applies from.
10) For the TDM Access Bearer product Terms On Application applies.
11) FlexZone is as defined at www.openreach.co.uk/flexzone